Payload included MISSE-FF 2, ECOSTRESS, and a Latching End Effector. The refurbished booster featured a record 2.5 months period turnaround from its original launch of the TESS satellite — the fastest previous was 4.5 months. This was the last commercial flight of a Block 4 booster, which was expended into the Atlantic without landing legs and grid fins.
Friday 29th June 2018 at 09:42 UTC
CCSFS SLC 40
Falcon 9
Yes
No
Units: kg
NASA (CRS)
SpaceX
All of these images are from the SpaceX Flickr page and all of them belong to SpaceX
chevron_left chevron_right